12

2026

-

01

Anspeed O&M Revamps Old Plants: Flow Battery Co-regulation Cuts Carbon 40%


Anspeed O&M's "Flow Battery + Thermal Plant" retrofitting solution delivers:
① TN ENERFLOW's 2MW/8MWh VFB units installed at turbine side
② AI load forecasting optimizing charge-discharge cycles
③ Blockchain-tracked AGC compensation
At Shandong’s 300MW coal plant:
► KP value surged from 0.7 to 0.98
► Coal consumption dropped 14g/kWh
► Annual CO₂ reduction: 21,000 tons
► Maintenance costs decreased by 35%
The plant now ranks top-10 in frequency-regulation bidding with $3.8M extra annual ancillary revenue. This model proves decarbonization can be economically viable – ROI achieved within 3.2 years.